The project team had a mission during (3-5 August 2023) to the installation site (research experimental pilot for waste water treatment using instream Wetland technology). The aim of this mission is to follow up on the proper operation of the pilot and to take water samples to test the treatment efficiency. The mission achieved its goal, and the water samples had been delivered to the certified regional laboratory of the National Water Research Center for water quality analysis.